Zura Residence Hall Renovation

Client
San Diego State University
Delivery Method
Awards & Mentions
  • CMAA, Regional & National Achievement Award, 2016
  • DBIA, Award Winner, 2015
  • LEED Silver
Expertise

Advancing Collaborative Design-Build: A New Approach to Campus Project Delivery

When San Diego State University set out to transform its aging Zura Residence Hall, the challenge extended beyond renovating a nearly 50-year-old building. The University needed a delivery strategy that could accommodate a complex modernization, maintain cost and schedule, and ensure the residence hall reopened for the Fall 2015 semester. Missing that deadline could result in more than $6 million in lost housing revenue.

OCMI partnered with SDSU to help develop and implement its Collaborative Design-Build delivery approach, which combines elements of traditional design-build and CM@Risk. Zura Hall became the University’s first major renovation delivered through this method, demonstrating how early collaboration, transparent cost management, and aligned project incentives could support successful delivery. The approach helped establish a model for subsequent projects at SDSU and across the California State University system.

Building the Foundation for Successful Delivery

OCMI supported the University from initial planning through procurement, design, and construction, helping establish the framework for a collaborative delivery process. Our team developed the RFQ/RFP documents, generated customized general conditions, incorporated project-specific milestones and phasing requirements, and supported design development and GMP review.

The selected design-build team included Balfour Beatty Construction, HMC Architects, and Mahlum Architects. Working together, the team applied Target Value Design principles to align scope, design decisions, and budget expectations while addressing the challenges of renovating an existing facility on an active campus.

Aligning Incentives with Project Success

One of the project’s most innovative features was an incentive program developed by OCMI and SDSU and incorporated into the procurement documents.

Rather than limiting performance incentives to the design-builder, the program extended financial rewards to the craft workers who executed the work. Once the construction milestones were established and achieved, a percentage of the incentive dollars was distributed to field personnel. This approach helped create shared accountability across the project team, reinforcing collaboration and maintaining focus on the University’s most critical objective: opening the residence hall on-time.

Transforming Student Housing on a Tight Schedule

Originally constructed in 1968, Zura Hall’s three residential towers required extensive modernization, including seismic upgrades, new mechanical and electrical systems, renovated living spaces, improved accessibility, and expanded student gathering areas.

OCMI provided comprehensive program and construction management, including design coordination, cost management, schedule oversight, constructability review, and stakeholder engagement. With construction taking place in the heart of an active campus, the team carefully coordinated logistics, restricted work hours, and inspections, and sequenced construction to minimize disruption. Through proactive planning and collaborative problem-solving, the team completed construction in just 14 months, welcoming students back for the Fall 2015 semester.

A Successful Model for Future CSU Projects

Zura Hall demonstrated the value of pairing an innovative project delivery method with strong owner representation and early preconstruction planning. The project was completed without claims or schedule extensions, avoided more than $6 million in potential lost housing revenue, and delivered a LEED Silver-certified facility that transformed the student residential experience.

More importantly, the project helped demonstrate how Collaborative Design-Build could be successfully applied to complex campus renovations, providing a valuable precedent for future capital improvements throughout the CSU system.