VA Southern Nevada Healthcare System

Client
Department of

Veterans Affairs

Using a variety of our cost control solutions to help deliver quality healthcare to our veterans in southern Nevada.

OCMI provided a range of cost control solutions throughout design for the new, $580 million VA Medical Center.

Our deliverables included comparative cost studies, continuous cost estimating from schematic design through construction documents, cost reconciliations, thorough market studies of the local and national construction markets, and change order reviews during the construction phase.

The new 750,000 SF facility supports the veteran population in Southern Nevada and the medical facilities at nearby Nellis Air Force Base.

Photography courtesy of Chris Brown.